Saved articles

You have not yet added any article to your bookmarks!

Browse articles
Newsletter image

Subscribe to the Newsletter

Join 10k+ people to get notified about new posts, news and tips.

Do not worry we don't spam!

GDPR Compliance

We use cookies to ensure you get the best experience on our website. By continuing to use our site, you accept our use of cookies, Cookie Policy, Privacy Policy, and Terms of Service.

Important Weekend Closure of Ballard Bridge Scheduled for Paving Project

Ballard Bridge Closure Set for June 6-9

This weekend, the Ballard Bridge will close from Friday, June 6 through Monday, June 9, as part of the ongoing 15th Ave W/NW & Ballard Bridge Paving and Safety Project. This closure is projected to be the final weekend of work concerning this specific project. However, due to the unpredictable nature of Seattle's weather, the Seattle Department of Transportation (SDOT) has strategically planned for backup closure dates from June 13-16 and July 18-21 if necessary.

Alternative Routes and Traffic Impact

During the closure, travelers and commuters should expect potential congestion in the area, particularly for those relying on the bridge to access points in Ballard and beyond. SDOT urges drivers to consider alternative routes, specifically recommending the Aurora Bridge and Fremont Bridge, to circumvent expected traffic delays.

The closure specifically targets the overpass at the bridge's north end, which crosses over Leary Way NW. Crews will conduct essential seismic retrofit work, a necessary upgrade to ensure safety and structural integrity in the event of natural disturbances.

Navigating the Closure

For those traveling southbound on 15th Ave NW, you will be required to exit at Leary Way and use the on-ramp to access the Ballard Bridge. Alternatively, drivers heading north will also exit down to Leary Way using the off-ramp after crossing the bridge, continuing into Ballard thereafter.

Fortunately, local access will remain open between NW Market St and NW 51st, allowing residents and businesses in that vicinity to avoid the brunt of traffic disruption.

It is worth noting that a previously scheduled closure for the weekend of May 30 – June 2 was canceled, which means drivers will have a brief respite this weekend before the upcoming closure starting on June 6.

Weather Considerations

The possibility of inclement weather affecting the work schedule remains a crucial consideration. SDOT will monitor conditions closely and adjust closure plans as necessary to ensure maximum efficiency and safety.

For regular updates on this and other city projects, travelers are encouraged to check SDOT communications, ensuring they stay informed as conditions evolve.

As Seattle approaches the summer months, maintenance and upgrades like these not only enhance safety but also aim to streamline city traffic patterns for years to come.

Bias Analysis

Bias Score:
10/100
Neutral Biased
This news has been analyzed from   24   different sources.
Bias Assessment: The article presents factual information regarding the bridge closure without expressing subjective opinions or bias. It maintains a neutral and informative tone suitable for general readers. Minor bias is acknowledged due to implicit prioritization of SDOT's recommendations but does not detract from the overall objective reporting.

Key Questions About This Article

Think and Consider

Related to this topic: